Layout background
This layout, by Liphook and District MRC member Ben Russ, is a representation of a small intermediate station set in the German Alps.
The station handles two mainlines (which have an extended run up and around the layout, in and out of a number of tunnels and over the four bridges (hence the layouts name)) and a small branch line (which has a smaller loop with tunnels on the base level)
Alongside the station which serves a small town (off scene) is a working sawmill and loco service yard. Also of interest is a working cable car to a mountain hotel.
The layout is DCC, which allows multiple trains to be running on the mainlines for extra interest and operator enjoyment.
Layout details
Size: Width 2470 (8? 1”) x Depth: 1420 (4? 8”) x Height: 1600 (5’ 3”) – please allow 915 (3?) at rear for operator (1)
Power supply: 2×13amp socket – includes illuminated canopy
Insurance value: £xxxxx (layout and electrics) + £xxxxx (rolling stock and controllers).-please ask
Exhibition expenses: Please request (based on van hire and distance from Liss, Hampshire).
Contact: Telephone: 01730 895702. e-mail: benruss.uk@googlemail.com
Pictures of layout